What to Include in a Standard Spray Booth RFQ
What to Include in a Standard Spray Booth RFQ
A complete spray booth request for quotation (RFQ) should describe the parts you will coat, the required booth layout, the coating process, operating conditions, utilities, safety requirements, delivery location, and the scope of supply. Include drawings or a dimensioned layout where possible, and clearly separate confirmed requirements from values you want the supplier to recommend. This gives suppliers a sound basis to assess feasibility, identify missing information, and prepare proposals that are easier to compare.
You can find more information on our web, so please take a look.
There is no single specification that defines every “standard” spray booth: booth design depends on the application, coating, workpiece, site, and applicable local requirements. At Jingzhongjing Group, we recommend sending the RFQ as a structured brief rather than asking only for a booth price. Use the checklist below to make your enquiry more complete and commercially useful.
RFQ Checklist: The Information Suppliers Need
1. Company, project, and quotation details
Start with the basics so the supplier can identify the project and understand its status. Provide your company name, contact person, project location, expected purchasing timeline, and whether the enquiry is for a new installation, replacement, or capacity expansion. State the requested quotation currency, delivery terms if known, and the date by which you need the proposal.
- Company name, billing address, and delivery or installation address
- Project name, contact details, and preferred communication language
- Required quotation deadline and expected order or commissioning schedule
- Whether the purchase is budgetary, for approval, or for an active procurement process
- Requested quotation validity and any required commercial documentation
2. Parts, production volume, and coating process
Describe what will be painted, not just the booth size you have in mind. Include the largest and typical workpiece dimensions, weight, material, surface preparation, and how parts enter and leave the booth. Explain whether operators spray manually, equipment applies the coating automatically, or the process combines both methods.
Give the coating type and relevant process details, such as water-based or solvent-based materials, expected coating steps, flash-off needs, and curing requirements. If available, share the coating technical data sheet and safety data sheet (SDS); these help suppliers assess process and material-handling considerations. Also state the intended production volume, operating shifts, and whether product changeovers are frequent.
3. Booth configuration and usable dimensions
Clarify whether you need an open-face booth, an enclosed booth, a walk-in design, or another configuration. Specify the usable working area separately from the outside dimensions, and identify doors, loading openings, operator access, and any conveyor or trolley interface. A sample layout could show a booth envelope of 6,000 × 4,000 × 2,800 mm; treat this as an illustrative RFQ value, not a recommended size.
Attach a site plan or floor layout showing columns, ceiling height, nearby equipment, access routes, and installation constraints. Identify whether the booth is standalone or must connect to existing production lines, exhaust ducting, or control systems. Mark any future expansion needs so suppliers can identify interface or layout considerations in their proposal.
4. Airflow, filtration, and environmental conditions
State the airflow arrangement you expect, if known: for example, crossdraft, semi-downdraft, or downdraft. If you do not know which arrangement is suitable, describe the coating task, part dimensions, and available site conditions, then ask the supplier to recommend an approach and explain its assumptions. Provide a required airflow figure only when it comes from a defined process or engineering basis; 20,000 m³/h can be shown as a sample RFQ field value, but it is not a universal spray booth requirement.
Ask the supplier to identify the proposed filter stages, filter access and replacement method, exhaust arrangement, and any stated design assumptions. Describe the installation environment, including ambient temperature, humidity if relevant, dust exposure, and whether exhaust routing is restricted. Specify who is responsible for confirming emissions, ventilation, fire protection, and other site or regulatory obligations in the destination jurisdiction.
Link to Jingzhongjing Group
5. Electrical, controls, and utilities
List the available power supply and any site limitations. For example, an RFQ might state 400 V, 50 Hz as the available supply, but buyers should confirm actual site values rather than copy this example. Ask suppliers to provide electrical load information, connection requirements, control-panel details, and a list of utilities needed for the proposed configuration.
Explain the expected control functions, such as fan start and stop, lighting, operating status indication, or interlocks, if these are required. Identify preferred control language, operator interface needs, and any connection to plant monitoring or existing equipment. Where flammable coatings or potentially hazardous atmospheres may be involved, state the materials and process conditions and ask suppliers to clarify the basis of their proposed electrical and safety design; do not assume a generic booth configuration meets local requirements.
6. Heating, curing, and optional equipment
State whether the RFQ covers spraying only or also flash-off, drying, or curing. If heating is required, describe the process target and ask the supplier to specify the proposed heat source, control approach, operating limits, and any dependencies. Avoid requesting a heater by name without explaining the coating process and site constraints.
List optional equipment as separate line items so you can compare proposals fairly. Depending on the project, this may include lighting, access doors, work platforms, conveyors, ductwork, exhaust fans, controls, spare filters, or installation support. Make clear which items are mandatory, optional, or to be priced as alternatives.
Commercial and Delivery Information
Scope, documentation, and schedule
Define what the quotation must include: equipment supply, packing, transport, installation, commissioning, operator training, and after-sales support. Ask suppliers to list exclusions and identify any work expected from your team, such as foundations, building modifications, electrical connections, or exhaust duct installation. A clear boundary of responsibility can prevent gaps between the equipment proposal and site preparation.
Request an estimated manufacturing and delivery schedule, with the assumptions behind it. Ask which technical documents are included, such as general arrangement drawings, utility requirements, operating instructions, maintenance guidance, and recommended spare-parts information. If you need documents in a specific language or format, state that in the RFQ.
How to make supplier quotations comparable
Ask every supplier to respond using the same format and to distinguish base equipment from options. A comparison table can include configuration, usable dimensions, airflow proposal, filtration, electrical requirements, included accessories, delivery terms, lead-time estimate, warranty terms, and exclusions. Request deviations from your specification in writing, with the reason and the effect on price, schedule, or operation.
| RFQ section | Buyer information to provide | Supplier response to request |
|---|---|---|
| Application | Parts, coating, production volume, and process steps | Proposed configuration and design assumptions |
| Layout | Workpiece envelope, site plan, access, and constraints | General arrangement and interface requirements |
| Utilities | Available power and other site services | Loads, connections, and utility schedule |
| Commercial scope | Delivery location and requested services | Price breakdown, lead-time estimate, exclusions, and terms |
Common RFQ Mistakes to Avoid
- Providing only outside dimensions: Share the largest workpiece and required operator or handling clearance to establish usable space.
- Leaving out coating information: Coating type and process conditions can affect equipment selection and safety review.
- Assuming “standard” means identical: Ask suppliers to state what their base offer includes and list options separately.
- Omitting site details: Ceiling height, access routes, exhaust routing, and utility limits can affect feasibility and installation planning.
- Comparing headline prices alone: Compare scope, exclusions, documentation, schedule assumptions, and support as well as price.
Summary and Next Steps
A strong spray booth RFQ answers five questions: what you are coating, how the process operates, what equipment and performance you need, what the site can support, and what commercial scope you expect. Include drawings, process documents, utility details, and a clear list of required and optional items. Where a specification is not yet confirmed, label it as open for supplier recommendation rather than presenting an assumption as a fixed requirement.
Before sending your enquiry, check that all suppliers receive the same information and response format. Jingzhongjing Group can review your application details and discuss the information needed to prepare a relevant spray booth proposal. Share your workpiece dimensions, coating process, site layout, power supply, destination, and target schedule to begin a practical RFQ discussion.
For more What to Include in a Standard Spray Booth RFQinformation, please contact us. We will provide professional answers.



